Resume

Drywall C. Resume –

ICS­400, IS­700.A NIMS Cert 
 
 
WORK HISTORY: 
 
NextEra Energy Resources  
2015 – to Present 
• Installation superintendent / owner representative /QA/QC Install Supervisor  
Wind Turbine/Solar 
• Larry Levin  701­371­5747 Project Manager  
 
M​ortenson ​ C​onstruction   
2014 – 2015 
• QA/QC Supervisor overseeing a team of 400 employees 
Solar World’s largest dual­axis tracker system 
• Joseph Garcia  210­605­5920  Superintendent 
 
Blattner Energy 
2014­2014 
QA/QC Supervisor, Millwright, Wind Turbine 
Wind Turbine   
• QC Supervisor, overseeing a team of 30 employees 
• Pat Kinkin  320­247­3324  Installation Superintendent 
• Matt Rousseau  678­770­1329 Installation Superintendent/Owner Representative 
 
M​ortenson ​C​onstruction   
2014 – 2014 
QA/QC Supervisor, Millwright, Wind Turbine A+ key traveler 
Wind Turbine   
• Jason Clark  402­274­7523  Superintendent 
 
Wanzek Construction    
 02/2013 – 01/2014 
QA/QC Supervisor   
Trans Canada Keystone Pipeline  
• Monitored rigging for installation of in­line pump placement, generators, and belt driven and 
rotary machinery 
• Oversaw the placement of all industrial mixer motors in oil tanks (5 total oil tanks, 25 motors per 
tank) 
• Directly oversaw 10 Foremen who had their own teams of 8­10 people (900 employees total on 
the project) 
• Monitored and inspected all concrete formations 
• Jamie Langston  701­318­5470  Superintendent 
 
American Site Builders    
02/2012 – 02/2013 
QA/QC Manager, QC Supervisor   
Transmission Towers (Texas)  
• Oversaw all erection and assembly 
• Oversaw 10 foremen where each foreman had their own rigger lead 
• Completed all top of tower rigging 
• Jaime Rhoades  520­566­0671  Project Manager 
 
Wanzek Construction     
11/2011 – 02/2012  
Supervisor, Base­Mid Foreman, Rotor­Build Foreman, Offload Foreman  
Main Erection Top off Foreman, Ironworker 
Wind Turbine (New Mexico and Texas) 
• Did 100% of rigging for complete project 
• Rig piping to off load it, prep it, rig again to get it set on the foundation 
• Jamie Langston  701­318­5470  Superintendent 
 
M​ortenson ​C​onstruction   
2007 – 2012 
Erection Supervisor, Millwright, Certified Avanti Specialist, Wind­ Solar  A+ key traveler 
Wind Turbine   
• Did 100% of rigging for complete project 
• Rig piping to off load it, prep it, rig again to get it set on the foundation 
• Oversaw very entry level Millwrights and Ironworkers where I had to do work to show them how 
to complete the task and continue retraining until they were up to speed 
• Jason Clark  402­274­7523  Superintendent 
 
Fulton Construction        1984 – 2007 
Construction Superintendent /General Foreman/ Supervisor, Carpenter Foreman and   
Millwright Foreman, Carpenter/Millwright Commercial and Industrial Construction 
• Career started in drywall then progressed into commercial carpentry 
• Gained multiple years as a Millwright 
• Paul Fulton  313­402­0441 
 
 
 
SUMMARY OF ADDITIONAL QUALIFICATION: 
 
• Strong PC computer skills, MS Office – Outlook, Word, Excel 
• Highly qualified professional, proficient in the following areas: Performance of field 
maintenance, overhaul, modification, and repair activities on all types of stationary electrical and 
mechanical equipment; Assigning, reviewing, and evaluating employees engaged in such work 
and applying sound supervisory principles and techniques in building an effective work force;  
• Supervised millwrights, iron workers construction crews, master carpenters, journeymen, general 
labor personnel. 

Last Resume Update July 29, 2016
Location Florence, Alabama
E-mail lock Locked
Resume File lock locked

Contact Candidate

Login or purchase this resume contact details.